COPYRIGHT © 2016 D.L. BANDY CONSTRUCTORS, INC - ALL RIGHTS RESERVED
This project was a phased project that included the replacement of existing HVAC equipment, ductwork, and piping distribution systems, automatic controls, lighting upgrades, installation of two new chillers, and an upgrade of the existing building electrical service on an occupied school campus.